Comparison of 20 MW plant installed capacity CSP and PV:

1. The amount of electricity generated in 25 years:
•  CSP: 933.450.000 kWh electric
          + 933.450.000 kWh thermal
•  PV: 652.880.000 kWh
•  Actual electricity generation is 43% more than PV
2. Possible service life:
•  CSP: up to 40 years
•  PV: up to 10 years
3. Investment:
•  CSP: 47.000.000 USD
•  PV:   30.000.000 USD
4. The payback period:
•  CSP: 5 years with additional use of thermal energy
•  PV: 11.45 years


Comparative table of advantages of CSP and PV:

COMPARISON